Skip to main content
10 events
when toggle format what by license comment
Mar 14, 2015 at 7:43 vote accept Techjar
Mar 14, 2015 at 7:40 comment added Techjar @ConnorWolf It's not my schematic, someone else made it.
Mar 14, 2015 at 6:07 comment added Connor Wolf For the love of FSM, please use the freaking ground symbol for ground connections, and the power symbol for power connections. They exist for a reason, and you're horribly abusing net-labels instead, for no good reason.
Mar 14, 2015 at 5:47 answer added Dwayne Reid timeline score: 9
Mar 14, 2015 at 5:29 comment added EM Fields @sherrellbc: It's a reservoir cap used to provide a lo-Z voltage source for the load when Q2 first switches ON.
Mar 14, 2015 at 5:14 comment added sherrellbc What is the point of C8 to ground?
Mar 14, 2015 at 5:11 history edited Techjar CC BY-SA 3.0
added 10 characters in body
Mar 14, 2015 at 5:01 answer added EM Fields timeline score: 0
Mar 14, 2015 at 4:55 review First posts
Mar 14, 2015 at 4:58
Mar 14, 2015 at 4:52 history asked Techjar CC BY-SA 3.0