Timeline for Solar panel and mppt / battery system advice
Current License: CC BY-SA 4.0
10 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
Jun 1, 2019 at 16:02 | comment | added | Dave Tweed | A lamp or battery charger would be fine. But forget about getting any significant amount of heat out of a system that small. | |
Jun 1, 2019 at 14:23 | comment | added | Bram B | Thanks you for your comments, 240wh i want to power a shed with no electric, basic stuff like a LED lamp or a heater in winter months (interval) maybe load worktool battery. | |
Jun 1, 2019 at 14:21 | vote | accept | Bram B | ||
Jun 1, 2019 at 14:08 | history | edited | JRE | CC BY-SA 4.0 |
added 17 characters in body
|
Jun 1, 2019 at 13:49 | answer | added | Electron | timeline score: 1 | |
Jun 1, 2019 at 13:41 | comment | added | Dave Tweed | What do you intend to power with this system? Is there something specific, or are you just "messing around" with it to try to learn something? In general, I'd say that a 50W panel is a good match for a 240 Wh battery (will recharge in about 5-6 hours), but the average continuous load would have to be on the order of just 3-5W (will discharge in 2-3 days). | |
Jun 1, 2019 at 13:39 | comment | added | user16324 | With 62V max from the panel, the first question is, is the charge controller rated for 62V? And its data suggests that it is. I see nothing obviously wrong here. | |
Jun 1, 2019 at 13:35 | history | edited | Dave Tweed | CC BY-SA 4.0 |
add material from comment, fix tags
|
Jun 1, 2019 at 13:05 | review | First posts | |||
Jun 1, 2019 at 16:52 | |||||
Jun 1, 2019 at 13:04 | history | asked | Bram B | CC BY-SA 4.0 |